Unit Price: | USD 10.0000 - 20.0000 / Piece/Pieces |
---|---|
Payment Type: | L/C,T/T,Western Union |
Incoterm: | FOB,CFR,CIF,EXW |
Min. Order: | 10 Piece/Pieces |
Delivery Time: | 30 Days |
Basic Info
Model No.: TR-J115
place of origin: China
Material: 1000 Series, 2000 Series, 3000 Series, 4000 Series, 5000 Series, 6000 Series, 7000 Series
shape: Round
Surface treatment: Anodized, Mill Finished
Whether alloy: Is Alloy
Annealed state: O - H112
tolerance: ±1%, ±5%
Processing Service: Bending, Decoiling, Welding, Punching, Cutting
Additional Info
Packaging: Standard export package
Productivity: 100000tons per month
Brand: Trumony
Transportation: Ocean,Land,Air
Place of Origin: China
Supply Ability: 1200000tons per year
Certificate: ISO 9001
HS Code: 7608
Port: Shanghai
Product Description
Product Name: Round Condenser Used Aluminum Filtration Liquid Dry Bottle for new energy car
Company Introduction:
Trumony Aluminum Co.LTD build from 2006, have export over 53 countries of worldwide. Our main products are aluminum alloy cladding material and other aluminum products like aluminum coil, aluminum foil, aluminum strip, aluminum pipe, aluminum tube etc, for aluminum battery cooling pad for electronic vertical, automobile heat exchangers such as Aluminum liquid storage tank, radiator, intercooler, condenser, evaporator and industrial heat exchangers, like electricity power radiator, air conditioner etc.There are complete sets of modern machinery and equipment operation workshops for casting, hot rolling, cold rolling, finishing and advanced check-out equipments for researching and testing,such as WDW-3010- micro-controlled electronic universal testing machine,CALS-2000 aluminum alloy metallographic image analysis system,etc.
Quick Details:
|
Product name | Dia/mm | Thickness | Suit for manifold tube size/mm | Length | Application |
1 | Aluminum liquid storage tank for heat exchanger | 30 / 32/ 35 | 2.0mm or customerized | 16/ 20/ 25/ 30/ 32 | 100-370 mm or customerized | Heat exchanger syetem of new energy car |
Round Condenser Used Aluminum Filtration Liquid Dry Bottle:
1.Cold extrusion, bottom blind hole.
2.The integrated liquid storage tank is produced by cold extrusion process to realize seamless extrusion of the tank.
3.One - piece extrusion, eliminates welding process of bottom cover.
4.The connecting block with the collector pipe is made of composite material and welded and fixed by automatic laser machine (it only plays a fixing role, and the air tightness is ensured by the composite material on the connecting block after welding with the furnace).
5.The optimized extrusion process, product cleaning (waste acid and alkali treatment) is more convenient, in line with the national environmental protection policy, after cleaning the product appearance to maintain the aluminum alloy natural color.
Product advantage:
1.Once extrusion molding, the tube bottom is a blind hole, eliminating the user tube bottom welding process and the trouble of repeated brazing due to the bottom cover leakage, the process ensures that there is no leakage at the bottom.Convenient installation of pressure reducing valve for new energy vehicles.
2.According to the characteristics of seamless pressure resistance of cold extrusion products, the wall thickness of the liquid storage tank is designed to be 2MM, and the appearance is free of cutting. The weight of the liquid storage tank is two-thirds of the weight of the original traditional product.More in line with the national energy-saving and new energy vehicles lightweight requirements.
3.Strict cold extrusion process system can control the wall thickness tolerance of the tank to be less than 0.1mm to ensure the blasting pressure after the product passes the furnace:>150KG
4.Product weight loss and the bottom of the blind hole structure, greatly reduces the product demand amount of heat in the process of brazing, avoid brazing process products due to pitting local high temperature or temperature is too low to produce the phenomenon of false welding, by lowering the temperature or increase the chain speed or increase the product put density method, improve the production efficiency and the qualified rate of the product, save energy and reduce the production cost.
5.The cost of new product development is eliminated, and the cost of new product development is reduced.
6.New product development cycle is short: 10 days for samples (5 days for special cases)
7.Integrated liquid storage tank for supporting sales: liquid storage tank body, aluminum alloy plug, o-ring, dryer, filter (as shown below)
1. Since 2006, we have rich experience in this industry in China;
2. Good reputation in aluminum material industry;
3. We have our own development department for new material research;
4. Good experience and cooperation with big client in the world;
5. With Certificate ISO9001-2008;
6. High performance cost ratio;
7. Fast delivery time;
8. Good communication skills, and good after sells service and understandings for customers;
© 2019 CHINA WAY. All Rights Reserved. Trumony Aluminum Limited, Inc. All rights reserved. site map. sitemap.html